PCBA First Article Inspection (FAI)

Verify the First Assembly Before Releasing the Build

Topline Circuit inspects the agreed number of first articles against the released assembly data and customer requirements. Specify the sample count, inspection stage and approval needed to continue production when requesting a PCB assembly quote.

What the First Article Inspection Can Cover

Inspection itemWhat we verifyWhat to specify
Build configurationBoard revision, assembly variant and fitted parts against the released BOM.Approved substitutions and do-not-populate locations.
Placement and workmanshipComponent location, orientation, polarity and applicable solder joint criteria.Critical reference designators, inspection method and acceptance criteria.
Critical dimensionsSpecified dimensions such as connector position or assembled height.Drawing revision and characteristic ID, measurement datum, nominal dimension, tolerance and units.
Electrical and functional checksSpecified tests on the first article under the approved procedure.Test steps, firmware revision, operating conditions and pass/fail limits.

Choose the Inspection Stage and Hold Point

Identify the stage for each check. Placement and polarity can be reviewed before reflow where required. Solder joints, assembled dimensions and functional results are reviewed at the applicable stages after soldering.

If customer approval is required before the remaining build proceeds, define the hold point, approval owner and release conditions on the purchase order.

First assembled board moves through inspection and approval before the rest of the build proceeds

Define the First Article Inspection Report

Example first article report linking a sample and drawing revision to characteristics, acceptance criteria and inspection results

Provide your report template or specify the fields you need. A report can identify the sample, assembly revision and inspection stage, then link each requirement to the measured value or inspection result, acceptance limit and supporting evidence.

Identify any required photographs, test records, signatures and delivery format when requesting a quote.

Resolve Findings Before Production Release

We record discrepancies against the relevant requirement and review the disposition with the designated approver. After an authorized correction or rework, we repeat the affected checks and retain the original finding alongside the new result.

For later builds, provide the previous approved report and a list of design, material or process changes. We review which characteristics need to be checked again.

A first article discrepancy record shows the initial finding, authorized correction and reinspection for the same sample

Files for a First Article Inspection Quote

  • Released assembly drawing, BOM, placement data and build revision
  • Sample count, inspection stages, critical characteristics and acceptance criteria
  • Required test procedures, firmware and fixture details where applicable
  • Report template, required evidence, hold point and approval owner

First Article Inspection FAQs

Yes, when the hold point is agreed in the order. State in the purchase order exactly which operation must wait, who can approve release and what report or test evidence they need. Agree on how to document the approval before the remaining build proceeds.

Send the previous approved report, the released new revision and a marked list of changes. We review which checks the change affects and agree whether to repeat those checks or the full inspection.

We record the requirement, actual result and sample identity. The designated approver reviews the proposed disposition. We keep the affected build at the agreed hold point while the finding is open. After authorized correction or rework, we repeat the affected checks, record the new result and obtain the required release approval.

Send your template with the quote request. Identify the mandatory fields, supporting photos or test data, required signatures and delivery format so we can confirm the reporting scope.

Send the assembly variants, panel layout and any required sample count with your quote request. If the count is open, identify which variants and panel positions you need represented so we can agree on the sample plan before production.

Yes, when it is included in the agreed plan. Send the approved procedure, firmware revision, fixture or cable details, test conditions and pass/fail limits. Identify the results that must appear in the report.

Discuss Your First Article Requirements

Send the assembly revision, critical checks, sample count and report requirements. Include your approval owner and any production hold point so we can review the scope for your quote.